Ha Lengthy-Cam Pha coastal highway places into operation | Enterprise


Ha Long-Cam Pha coastal road puts into operation hinh anh 1A coastal highway connecting Ha Lengthy and Cam Pha cities within the northern province of Quang Ninh isput into operation on April 30. (Picture: VNA)

Quang Ninh (VNA) – A coastal highway connecting Ha Lengthy
and Cam Pha cities within the northern province of Quang Ninh was put into operation on April 30.

The coastal highway has a complete size of 18.7km, together with 10.2 km
passing via Cam Pha metropolis.

It has six lanes and a designed velocity of 60km per hour.

The highway runs from Tran Quoc Nghien Street in Ha Lengthy metropolis and ends at a T-junction close to Km6 Quang Hanh port in Cam Pha Metropolis. The mission performs a significant function in connecting, creating and increasing area of the 2 cities within the Ha Lengthy and Bai Tu Lengthy bays.

Cao Tuong Huy, appearing chairman of the Quang Ninh provincial Individuals’s Committee, mentioned the completion of the highway will assist ease visitors density on the Nationwide
Freeway 18 and appeal to extra vacationers to the locality. The mission can also be
anticipated to enhance the fabric and religious lifetime of
native residents, he mentioned./.

VNA



Related Articles

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Latest Articles